An exhibit display that consisted of a few divider walls that helped to outline the booth space during the convention. The unit was engineered in parts with slip joints for easy assembly and shipping. Once construction drawings are developed, the parts are then setup to be cut by a cnc machine and numbered for final construction. Having knowledge in the trades is the key when engineering projects that are based on assembly and production. The design was by Exhibit Works and took 3 days to engineer and get ready for fabrication.