The build-out was for a non-profit group based in Detroit, Michigan. The materials used were strawboard, composite deck boards along with standard grade plywood. The parts were fabricated in the shop and then assembled on location. The strawboard was stained and then clear coated to help maintain its color over typical everyday use. The build took 3 weeks with installation taking 4 days. The designer of the project was the Detroit Collaborative Design Center and the client was N-Power.